The Situation
The space needed a complete plumbing build-out from bare slab — new drain lines, a water system sized for beverage-service equipment, and every fixture — installed to code and on schedule for the tenant improvement timeline.
KCB Plumbing's Approach
Saw-cut and excavated the slab to run new drain lines to the planned service and restroom fixtures.
Installed the water system sized for beverage-service equipment and restroom fixtures.
Patched and finished the concrete, then set and connected all fixtures.
Sequenced the work so plumbing was ready ahead of other trades and the inspection timeline.
Practical Outcome
The example shows how KCB Plumbing handles a full commercial plumbing scope — cutting, drainage, water systems, and fixtures — as one coordinated build rather than separate subcontracted pieces.