Laguna Beach - Water Treatment

Completed KCB project

Laguna Beach Whole-Home Water Treatment Installation

A completed KCB Plumbing water-treatment project that required tracing the existing main and irrigation branches before installing the new equipment and accessible copper connections.

Location
Laguna Beach, California
Project type
Whole-home water treatment
Documented scope
Line tracing, separation, and installation
Privacy
Homeowner and address withheld

The Situation

The existing water layout included domestic and irrigation branches that needed to be traced before the treatment equipment could be tied into the intended water path.

KCB Plumbing's Approach

1

Reviewed the accessible main-water and irrigation connections before choosing the treatment tie-in points.

2

Traced and separated the irrigation branch from the water line serving the treatment equipment.

3

Installed the twin-tank treatment system with copper piping, shutoffs, and service access around the equipment.

4

Documented the existing connection area and the completed installation for a clear before-and-after record.

Practical Outcome

The completed project shows the treatment equipment and revised copper routing in an accessible layout. Homeowner and exact address details are intentionally omitted.

Original field footage

Project Footage

These clips were recorded during this KCB Plumbing project. Customer names and exact property details are not shown.

Existing main-water and irrigation connections

The existing connection area was reviewed so the irrigation branch and the line serving the treatment equipment could be routed intentionally.

Completed Laguna Beach water-treatment installation

The finished installation shows the twin-tank equipment, copper piping, shutoffs, and access needed for future service.

Call NowGet Estimate