A useful tankless installation quote names the selected model and the work needed to install it at your property. “Supply and install tankless heater” leaves gas demand, venting, drainage, power, service access, and permit responsibility unresolved.
Use the checklist below to compare written scopes. It draws on named manufacturer manuals, whose requirements differ by model. It is not a homeowner installation procedure or a claim that every tank-to-tankless conversion needs the same upgrades.
Name the model and the operating assumptions
Ask for the exact model, fuel, indoor or outdoor configuration, location, and the basis for meeting the home's expected hot-water demand. Include any recirculation equipment and explain which fixtures may run together. A maximum advertised flow figure alone does not establish performance under every incoming-water temperature or household demand.
Keep the applicable installation manual with the scope. This guide uses Rinnai RE/VE document 100000722(02), copyright 2021; Navien NPE-A2/S2 version 2.0, January 2026; and Noritz NRCR revision 04/21 as examples of matters an installer must evaluate. They do not establish which brands or model revisions KCB will install.
Ask how the gas supply will be assessed
The Rinnai RE manual says gas sizing must account for the heater and other gas appliances, using the applicable sizing method. The Navien installation manual also calls for adequate meter capacity and professional inlet-pressure evaluation.
Ask whether the proposal includes gas-load calculations, assessment of the existing route and meter capacity, any identified piping changes, and coordination with the gas utility if needed. Do not assume a certain pipe diameter is sufficient or that every conversion requires replacement of the entire gas line. Gas testing and alterations belong to qualified professionals.
If gas odor or another suspected gas leak occurs, follow SoCalGas safety guidance: leave immediately and call from a safe location. Do not inspect gas connections or wait for a routine installation appointment.
Make venting and condensate separate scope items
Ask for the vent and combustion-air route, approved materials, termination location, clearances, and any wall or roof work and restoration. The Rinnai RE non-condensing manual prohibits PVC, CPVC, and ABS venting for that family. Navien's condensing models allow specified materials under their own instructions. A material approved for one heater is not permission to use it on another.
For a condensing heater, ask how condensate will reach an approved disposal point and whether a pump or neutralizer is included or required for the design. Navien lists different disposal options and directs installers to local requirements. The Noritz NRCR manual has its own condensate instructions. Do not merge their specifications into one universal requirement. Even Rinnai's non-condensing indoor models discuss vent condensate.
Include power, water connections, and future access
- Electrical supply: Identify the suitable grounded supply and any electrical work, with responsibility assigned to the appropriate trade.
- Water connections: List the connections and any piping changes actually needed for this site.
- Service valves: Specify isolation valves and flushing access; Rinnai describes their role in isolating the heater for heat-exchanger service.
- Safety provisions: Include the model-required relief-valve arrangement and any thermal-expansion provision the installer identifies for the system.
- Access and restoration: Explain mounting location, service clearances, equipment removal, and patching or finishing work.
These are questions for the installer, not instructions to wire an appliance, modify a safety valve, or connect gas yourself.
Address water conditions and maintenance
Provide your supplier's report and ask whether a current water measurement is needed. The named manuals include water-quality requirements and different treatment guidance. Ask what treatment, if any, is proposed, what model it uses, and how local restrictions affect the choice.
Request the selected heater's maintenance instructions, model identification, startup records, and an explanation of how it can be isolated for future service. Avoid a proposal that relies on a universal flushing interval without identifying the manufacturer's instructions and water conditions.
Assign the local permit route and completion record
Costa Mesa's Insta-Permit route excludes tankless conversions from its limited tank-water-heater scope. Describe the full conversion to Building Safety. Newport Beach applicants should confirm the current category through its online permitting guidance.
Santa Ana's residential water-heater handout, revised December 2022, asks for manufacturer and vent instructions plus gas-demand calculations for tankless inspection. Confirm current requirements rather than using its older code citations. Irvine's published automated route describes like-for-like replacement in the same location; it does not establish tankless-conversion eligibility.
Ask who applies, coordinates required inspections, and supplies final approval documents. Permit issuance and final approval are separate milestones.
For a site-specific scope discussion, see KCB's tankless installation services and water-heater replacement and installation. KCB Plumbing serves Orange County from Costa Mesa Monday–Friday, 7 AM–6 PM, and Saturday–Sunday, 8 AM–5 PM; call (714) 894-6520 to discuss availability. The contact form is not emergency dispatch.
Last updated: October 2, 2026
About the Author
KCB Plumbing
Plumbing guidance from KCB Plumbing, based in Costa Mesa and serving Orange County since 1998.
Have a plumbing question? Call KCB Plumbing at (714) 894-6520 (Monday–Friday, 7:00 AM – 6:00 PM; Saturday–Sunday, 8:00 AM – 5:00 PM).